Original PDF

by Scott Eby, 2002

Electrical Infrastructure Upgrade - Kitsap Cabin Phase 1

Notes:

This project includes a mixture of existing and new installations. The Mountaineers Kitsap Cabin Committee, or its representative will be informed of any code violations found during inspections which are due to existing electrical installations. All changes made during the work will be approved by the Kitsap Cabin Committe, or its representative.

The servicing utility is Puget Sound Energy: 1-888-225-5773. The local jurisdiction office is Washington State L&I, Bremerton: 1-360-415-4039

The following scope of work is not in any particular order. The work may be performed in any order that seems efficient and safe. All permits, inspections and fees are the responsibility of the electrical contractor.

All work to be performed will conform to the NEC 2002 code and applicable local jurisdiction requirements. The property and buildings are available for inspection prior to bidding by appointment on most weekends.

The Kitsap Cabin Committee will perform all trenching operations using volunteer labour. All trenches will be a minimum of 24” deep by 24” wide, with the exception of the Grounding Ring trench around the main lodge building. The contractor may install access boxes in conduit runs as required to assist the installation of wire.

Upon completion of the work, a site map will be provided to the Kitsap Cabin Committee indicating the location and type of any access boxes installed on the property. Additionally, an ‘as built’ drawing will be created indicating any deviations from the approved initial design.

1. Install 320 Ampere service on East wall of Woodshed tool room.

2. Install Feeder to Main Lodge building.

3. Remove the existing disconnecting switch on West interior wall of Woodshed tool room.

Remove the existing feeder from the existing panel board and the disconnecting switch.

4. Install a feeder to the existing panel board on the West interior wall of Woodshed tool room.

5. Re-wire the existing outside outlets on the South wall of the Woodshed tool room to a new 20 Ampere circuit in the existing panel box.

6. Install a 60 Ampere weather-proof panel board in the Wellhouse above the well head.

7. Re-wire existing branch circuits in Wellhouse into the new panel board.

8. Install a feeder from the service panel to the Wellhouse.

9. Install new 100 Ampere panel board in the Bathroom facility.

10. Re-wire Bathroom Facility.

11. Install a feeder from the service panel to the Bathroom facility.